Welcome to your HiveRadar Portable Edge Data Center
A short, point-by-point video series that walks you through the unit from the moment it arrives on site: unpacking, deployment, power-on, and everything you need to be fully operational.
Introduction
Start here for a quick orientation to your HiveRadar Portable EDC and what this video series will walk you through.
Removing Lids & Transportation Locks
Safely remove the shipping lids and release the internal transportation locks before any setup begins.
Leg Identification
Identify each numbered leg so the frame assembles in the correct orientation every time.
EDC Deployment
A step-by-step walkthrough of deploying the unit from transport configuration into full operating position.
What's Inside the EDC
A guided tour of the compute, networking, and power components housed inside the EDC.
Operating the Drawers
How to open, close, and secure the equipment drawers during day-to-day operation.
Powering On the EDC
The correct startup sequence, plus what to look for when verifying a clean power-on.
Mounting the Access Point
Installing and aligning the wireless access point / gateway for on-site connectivity.
Workbench Assembly
Deploying the integrated workbench so you have a usable work surface at the site.