Before You Start
Check the site before the P-EDC arrives. Everything here applies to both editions.
Site
- Shelter: a tent, trailer, office or covered outdoor space. The P-EDC is in a ruggedized case but is not weatherproof: no rain, spray, direct sun or heavy dust.
- Ground: firm and level. The EDC legs have one fixed height and cannot be adjusted, so if the unit rocks or leans, move it, or run it without legs on a table or other raised surface.
- Security: a locked or supervised area if the P-EDC holds sensitive data.
- Uplink: plan where the site network cable or the gateway mast will go. For a cellular gateway, pick a spot with good signal and room for the mast.
Space and airflow
Air comes in at the front and leaves at the rear. There are no side vents.
| Side | Keep clear | Why |
|---|---|---|
| Front | 6 in (15 cm) for airflow, about 24 in (60 cm) to work | Air intake, compute drawer access |
| Rear | 12 in (30 cm) | Exhaust from the fans in the top drawer, PDU access |
| Sides and top | Room to reach the side handles | No vents |
Both lids stay off while the P-EDC is running. Keep the top drawer empty while running, including the accessory pouch; the fans sit at its back.

Environment
| Range | |
|---|---|
| Operating temperature | 5 to 35 °C (41 to 95 °F) |
| Recommended | 15 to 27 °C (59 to 81 °F) |
| Storage temperature | -20 to 60 °C (-4 to 140 °F) |
| Humidity | 10 to 85% operating, 5 to 95% storage, non-condensing |
If the P-EDC arrives cold, let it reach room temperature before you power it on: at least 1 hour, longer if it came from below freezing. This prevents condensation on the boards.
Power
-
PDU: region-specific. North America: ECP106, 100-120 V, 12 A. International: ECP106-INT, 200-240 V, 10 A. Check yours matches the local supply.
-
Cord: 6 ft (1.83 m), detachable, into the C13 inlet on the left of the PDU. NEMA 5-15P in North America; Schuko by default for International, other plugs on request.
-
Outlet: grounded, within reach of the cord, and easy to reach in an emergency.
-
Extension cords: avoid them. If you must use one, use a grounded, heavy-duty cord rated for at least 15 A (NA) or 10 A (INT), as short as possible, and never chain cords.
-
Batteries and generators: see Power and Batteries.
-
Power draw: typically around 200-250 W. It depends on the edition, the options and the workload.
Lifting and moving
- NUC PRO
- HR-01-2
92.7 lb (42 kg) without the box, about 110 lb (50 kg) in the shipping box.
87 lb (39.5 kg) without the box, about 110 lb (50 kg) in the shipping box.
Lift with two people using the side handles. One person can roll the P-EDC on its wheels with the telescopic handle.
Load limits
Overloading the work surface or putting weight near its edges can tip it over.
| Surface | Maximum load |
|---|---|
| Work surface (Lid 1) | 8 lb (3.6 kg), centered |
| Bench (Lid 2) | 220 lb (100 kg), sitting only, never stand on it |
What you need
- A laptop with an Ethernet port (or adapter) and a web browser
- Your Access & Configuration Sheet: it comes in the envelope with the welcome letter and by email when your order is processed. It lists your addresses and logins
- A site network cable, or the gateway that shipped with the P-EDC
Next: Unbox and Inspect